At PEARCE , we've got a career for you!
Pearce is a leading technology-enabled provider of asset management solutions for mission-critical electromechanical infrastructure throughout North America. Pearce provides technical maintenance, repair, operations, and engineering services for uninterruptible power supply (UPS) systems, backup power generators, battery energy storage systems (BESS), critical cooling systems, and other electrical and mechanical infrastructure across end markets such as renewable energy, telecom, and data centers. Founded in 1998, Pearce has more than 4,000 employees and 28 locations across the U.S. Pearce is a wholly owned subsidiary of CBRE Group, Inc., the world’s largest commercial real estate services and investment firm. To learn more about Pearce visit http://www.pearce-services.com .
Your Impact:
We are looking for an experienced nationwide Central Office installer who knows what it takes to work inside active carrier facilities. As a Level 3 technician, you will complete skilled installation, testing, and integration assignments as part of a crew led by a Level 4 Working Lead.
This position is dedicated to Central Office work. Direct experience with -48V DC distribution, fuse panels or BDFBs, equipment installation, fiber and copper cabling, approved MOPs, and carrier standards such as TP76300 is important. Experience limited to outside plant, residential, commercial cabling, or data-center-only installations does not meet the required carrier Central Office background.
A strong candidate can describe Central Office work they personally completed in the field, how they verified material and measurements, and how they documented testing and closeout. Primary assignments are at Central Offices across the US.
Core Responsibilities:
– Participate in job-start installation walkthroughs; verify actual equipment locations, cable routing and measurements, materials, site access, work restrictions, and safety requirements against project documents.
– Install, modify, and remove Central Office transport, transmission, switching, and routing equipment; install relay racks, bays, cable racks, pathways, and associated infrastructure.
– Install and terminate -48V DC power cabling, equipment power leads, fuse panel/BDFB connections, grounding, and bonding within qualifications and approved scope; perform power-related work only under authorized procedures and supervision.
– Install, route, lace, secure, terminate, label, and test fiber-optic, copper, coaxial, DC power, and grounding cables in accordance with customer standards.
– Read and follow job specifications, engineering drawings, cable running lists, wiring diagrams, schematics, MOPs, and test requirements; record differences between drawings and actual site conditions.
– Perform approved continuity, polarity, connectivity, fiber and copper tests, equipment checks, alarm verification, and turn-up support; record results accurately.
– Compare part numbers, material quantities, cable lengths, and site measurements with the issued installation package; report shortages or discrepancies to the Level 4 Lead for Engineering/PM resolution before affected work begins.
– Follow daily assignments and approved MOPs; coordinate with the Level 4 Lead before changes to scope, work sequence, or operating systems, and stop work when unsafe or unauthorized conditions arise.
– Complete daily progress updates, labeled QA photographs, test records, material usage notes, drawing redlines, and closeout documentation for assigned work.
– Support Level 4-led field inspections, corrective actions, customer walkthroughs, and final acceptance; assist less-experienced technicians when directed by the assigned lead.
– Take ownership of the accuracy, safety, workmanship, productivity, and documentation of assigned Central Office installation tasks; work as part of the team under the Level 4 Lead.
– Identify and immediately escalate material shortages, drawing conflicts, access…